Concrete pump is a very common mechanical equipment in the construction, it is dexterous, easy to drag, economical and cheap, so it is welcomed by the majority of builders. Compared with other concrete pumps, mixing pump in use, need to install the pipeline to construction, more need to pay attention to certain skills. So what problems should be noted in the use of mixer pump? This is a problem that many constructors are very concerned about.
ZLIN concrete manufacturers of the company's technical staff analysis: mixing pump in the construction of the project is used very much, this is because it is not only on-site mixing of concrete, but also conveying concrete, a machine dual-use, so the majority of the construction side of the welcome. So what problems should be noted in the use of concrete pumps? First of all, before using the mixer pump to pour concrete, be sure to place the equipment on a flat, solid, a certain distance from the edge of the pit, and in line with the provisions of the power supply on the site. After these basic items are done, we should pay attention to the following points:
Laying pipes in a straight line
In the construction site should usually ensure that there is a sealed protective shed, while the fabric pole in the cantilever action within the scope of no obstacles, there is no high-voltage lines. In addition, in the process of laying pipes, usually the guarantee pumping equipment and pouring points of the pipeline laying line is straight, minimise bending, while the laying of pipe support and pipe fixing must be made tight and reliable, pipe joints should be kept sealed and reliable, shall not be mixed with the hose and steel pipe.
Installation of key parts
In the process of installation, it is forbidden to install the vertical pipe of mixer pump directly on the output port of ground pump, and it is recommended to install the horizontal pipe with a length of not less than 10 metres before the vertical pipe is set up, and ensure that the horizontal pipe is equipped with a backstop valve at the entry point of the pump, and at the same time, when laying the downward-sloping pipe, it is recommended to install the horizontal pipe at the lower end of the pipe, and the length of which should be at least five times as long as the height of the sloping pipe.
Clogging
In the construction of the conveying pump pipe if once blocked, it is recommended that the first stop pumping, check the blocked pipe after the first pipe unloading clean up, and then re-installed firmly, sealing clean up after its reset. It is necessary to point out that, usually mixer pump conveying pipe should be strictly prohibited to install to the car transfer pump for use.
Handling of fabric rod use and storage
In the process of use and storage period, the general fabric rod must be fixed firmly with ropes from multiple directions, if it is not possible to pull the proposal to set up a temporary support; it is recommended that the balance of the fabric rod lifting locks firmly, the assembly should be prevented from biting the hand of the pipe mouth, and in addition, the fabric rod should be placed on a flat and solid site.
Climate condition
In the process of use, ensure that the conveyor pump using the boom operation in the wind speed less than 16 m / s below, if the wind is greater than six or more shall not use the cantilever, but in the heat of the weather you can choose to use wet sacks and other pieces of pipe cover.
The use of mixing pump has greatly improved the efficiency of construction. What other problems should be noted in the use of mixer pump? How to maintain the mixing pump you have other questions, welcome to leave a message on our website, we will receive you 24 hours a day, to answer your questions.