Trailer Pump is a kind of concrete pump used very much by many constructors at present, which can not only carry out on-site mixing, but also convey the coagulation, so it is very popular among constructors. However, in order to extend the service life of the concrete pump, regular maintenance of the concrete pump is very important, then how to maintain the trailer pump?
For this problem we visited the relevant experts, experts pointed out: Trailer pump as a new rural construction used very much of a product, the mixing of plastic, dry, hard, mobile concrete and lightweight aggregate and mortar are very words with, so in practice most of the projects can be used trailer pump mixing conveyor, then how to mix the everyday construction Trailer pump maintenance? Now we specifically introduced as follows.
1. Regular cleaning
In daily work, the Concrete trailer pump body cleaning is very important. Usually, the body should be completely removed from the dirt and other impurities can prevent and reduce the occurrence of mixer pump obstacles. In particular, it should be noted that after each operation, the Concrete trailer pump must be cleaned.
2. Lubrication maintenance
The lubricant of Concrete trailer pump is quite important. Before the operation of Concrete trailer pump, it is usually necessary to check the oil, electric circuit and control equipment at each lubrication place, and add lubricant according to the demand. At the same time, it is necessary to check whether the transmission clutch and brake are sensitive and reliable before operation every day. Is the wire rope damaged? Is the track pulley good? There are no obstacles around and the lubrication of each part.
3. Leakage protection
Concrete trailer pump to take the second level of leakage protection is very necessary before general operations should be connected to the power supply, and then carefully check to make sure that it is qualified, after the empty test run to confirm the qualification before normal operation.
4. Idle running check
Daily operation should be carried out before the idling check, the specific method for the Concrete trailer pump should be added to the churning drum idling for 1 to 2 seconds, check the clutch and brake equipment operation reliability. Then in the operation process, pay attention to listen to the motor, reducer, transmission gear noise is normal, whether the temperature is too high? Each time the mixer pump is turned on, you must first check whether the operation of the components is normal? When stopping the machine, you must check whether the mixer blades are bent, and whether the screws have been knocked down or loosened.