1. Concrete pump operators must be specially trained, familiar with the mechanical properties of the pump truck, master the operation methods and precautions of the pump truck, conscientiously perform the safety duties of this post in production and comply with the relevant safety regulations of the site.
2. Concrete pump used to transport concrete, should comply with its use and operating procedures, pipeline joints, safety valves must be intact, the shelf of the pipeline must be solid, and with the pumping part of the structure of the formwork off since the support system, before the transport of water test delivery, maintenance must be unpressurised, after maintenance must be test delivery.
3. When the concrete used has admixtures, the person who mixes the admixture must operate carefully and be careful to prevent injuries.
4. When the pump pipe is connected, the erection must be reliable and firm, and when it is suspended across, a steel pipe row frame must be set up, and in order to prevent the pumping process from swinging, anchor reinforcement can be used.
5. Concrete pump truck conveying pipe connection, must use intact special card bolt, construction should have spare card bolt and perishable accessories.
6. Before the concrete pump truck works, there must be perfect means of communication at the pump truck site and in the concrete construction silo for the safety of the construction.
Concrete transfer pump and other concrete mixing equipment is ZLIN Heavy Industry’s well-received products, Henan ZLIN Heavy Industry Co., Ltd. is a collection of scientific research, production, sales and after-sales service in one of the large construction machinery and equipment enterprises, welcome the majority of consumers call for advice: Whats app: +8617638132352 , Email: [email protected]