Operating points before formal operation1

Concrete pump conveying machine before the formal construction operation, it must be a comprehensive inspection. It mainly includes: whether the fuel, lubricating oil and brake fluid and other additives are sufficient, if not, it should be supplemented in time; the mixing barrel and the chute and other parts that are prone to cracks and damages should be carefully inspected to ensure that the concrete mixer truck will not fail in the process of using it. If any problems or safety hazards are found during the inspection, it must be reported to the relevant departments and requested to be handled by the corresponding technicians.

Operational points in the formal operation2

The service life of the mixing pump is limited, in order to prolong the service life of the mixing pump, the machine should be warmed up for a short time, to ensure that the values on the various meters are in line with the standard conditions before starting the internal combustion engine to start work. In the formal operation, let the mixing drum keep idling at low speed first, and then load the material after everything is normal. In order to ensure the safe use of concrete mixer truck, must not appear overload phenomenon.

At the same time, in the process of loading, it is necessary to ensure the accuracy of the corresponding operating procedures of the mixing pump, to avoid transportation safety accidents in the transportation process, but also to ensure the efficiency and quality of concrete delivery.